Analysis of the application of value engineering in the building construction project of State Elementary School 1 Padang Sambian
DOI:
https://doi.org/10.55942/pssj.v6i3.1258Keywords:
cost efficiency, Dell’Isola, value engineeringAbstract
Cost efficiency is an important aspect of project planning. One common approach to increasing cost efficiency is value engineering. This study applies Value Engineering to the Padang Sambian 1 Public Elementary School Building Construction Project with a total planned budget of IDR. 10,019,488,000.00. The analysis was conducted using the Dell'Isola method, which consists of four stages: information, creative, analytical, and recommendation. Based on the results of the study, the items carried out by Value Engineering include concrete work items on floors 1, 2, 3 and the roof, wooden plank truss work and roof tiles (roof work), door window hanging and locking work on floors 1, 2, and 3, masonry and plastering work (wall work) on floors 1, 2, and 3, paving block installation, ceramic floor and wall installation on floors 1, 2, and 3, and ceiling work on floor 3. The cost efficiency obtained using the Dell’Isola theory value engineering method is IDR. 224,566,091.39 or 2.24% of the total project cost with details of savings of IDR. 69,226,207.23 on concrete work on floors 1, 2, 3, and roof, IDR. 58,015,626.87 on truss work, wooden planks and roof tiles (roof work), IDR. 6,890,888.88 on door and window hanging and locking work on floors 1, 2, and 3, IDR. 1,160,097.63 on masonry and plastering work (wall work) on floors 1, 2, and 3, IDR. 48,561,507.2 on paving block masonry, IDR. 18,528,260.2 on ceramic floor and wall masonry on floors 1, 2, and 3, and IDR. 22,183,503.3 on the 3rd floor ceiling work. The benefits of applying value engineering are that it can reduce project costs without reducing the function, quality, and performance of the building, while providing a more efficient technical basis for decision-making at the planning and construction implementation stages.
References
Elhegazy, H. (2022). State-of-the-art review on benefits of applying value engineering for multi-story buildings. Intelligent Buildings International, 14(5), 544-563. https://doi.org/10.1080/17508975.2020.1806019
Husal, H. R., Ginting, R., & Anizar, A. (2024). Integrated value engineering with qfd and dfa as product design and development techniques: Literature review. Jurnal Sistem Teknik Industri, 26(1), 22-34. https://doi.org/10.32734/jsti.v26i1.11901
Li, X., Wang, C., & Alashwal, A. (2021). Case study on BIM and value engineering integration for construction cost control. Advances in Civil Engineering, 2021(1), 8849303. https://doi.org/10.1155/2021/8849303
Liu, J., Zhang, J., Ma, Z., Zhang, H., & Zhang, S. (2023). Three-dimensional measurement of full profile of steel rail cross-section based on line-structured light. Electronics, 12(14), 3194. https://doi.org/10.3390/electronics12143194
Meilasari, S. K., Oetomo, W., & Witjaksana, B. (2023). Value Engineering Analysis on The Architectural Work Of The Arjosari Malang Type A Terminal Revitalization Project. JETBIS: Jurnal Ekonomi Teknologi dan Bisnis, 2(8), 556-570. https://doi.org/10.57185/jetbis.v2i8.53
Partuti, T., Hasanah, I. U., Suwandana, R. F., Dwiyanti, Y., & Alhamidi, A. A. (2022, April). Copper Layer on an Aluminum Door Frame to Prevent Spread of Bacteria. In Materials Science Forum (Vol. 1057, pp. 197-204). Trans Tech Publications Ltd. https://doi.org/10.4028/p-m6304q
Pechorskaya S.A., Galishnikova V. V., Gebreslassie S. B., Damir H. Y. (2021). Structural analysis of high-rise building using ETABS and RSA software. Structural Mechanics of Engineering Constructions and Buildings, 17(2), 133–139. https://doi.org/10.22363/1815-5235-2021-17-2-133-139
Purba, B. C. (2024). Perencanaan strategis sarana dan prasarana penunjang proses pendidikan. JIMAD: Jurnal Ilmiah Mutiara Pendidikan, 2(3), 62-77. https://doi.org/10.61404/jimad.v2i3.101
Stefanuto, P. H., & Focant, J. F. (2020). Columns and column configurations. In Separation Science and Technology (Vol. 12, pp. 69-88). Academic Press. https://doi.org/10.1016/B978-0-12-813745-1.00003-9
Wang, T., Abdallah, M., Clevenger, C., & Monghasemi, S. (2021). Time–cost–quality trade-off analysis for planning construction projects. Engineering, construction and architectural management, 28(1), 82100. https://doi.org/10.1108/ECAM-12-2017-0271
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Ronaldi Matung, I Nyoman Indra Kumara, Decky Cipta Indrashwara, Dewa Ayu Trisna Adhiswari Wedagama

This work is licensed under a Creative Commons Attribution 4.0 International License.