Project control using S Curve in provision of pedestal crane at PT. Medco E&P Natuna - West Belut Platform
DOI:
https://doi.org/10.55942/pssj.v5i8.489Keywords:
Construction, pedestal crane, project managements, s curves, time scheduleAbstract
In the implementation of a project, three main aspects are indicators of the success of the project: cost, schedule, and quality. If the cost and time of project implementation are in accordance with the planning and quality requirements, then the project can be said to be successful. Time plays a significant role in construction management projects, where time is also a management function. With good and proper time control, obstacles to delays in project implementation can be avoided as much as possible. The purpose of this study was to determine the cause of the achievement or deviation of work between the realization in the field and the planned time schedule for the procurement of a pedestal crane unit for a new platform in the operational area of block-B-Natuna.
References
Abdillah, G. S., Waluyo, M., Teknik, F., Gunung, M., Surabaya, A., Surabaya, K., Teknik, F., Gunung, M., Surabaya, A., & Surabaya, K. (2025). Jurnal Hasi Penelitian Dan Pengkajian Ilmiah Eksakta. 04(01), 8–13.
Agnes Maria Wijaya. (2015). Monitoring Penjadwalan Proyek & Evaluasi Jumlah Tower Crane Pada Proyek Condominium & Podium Sebuah Plaza Di Tengah Kota. 4(2), 1–6.
Al-bab, U., & Hepiyanto, R. (2024). Analisa Manajemen Waktu Pekerjaan Renovasi Pembangunan Cafe Terakota. Jurnal Talenta Sipil, 7(1), 142. https://doi.org/10.33087/talentasipil.v7i1.400
Amani, W., Helmi, & Irawan, B. (2012). Perbandingan Aplikasi CPM, PDM, dan Teknik Bar Chart- Kurva S Pada Optimalisasi Penjadwalan Proyek. Buletin Ilmiah Math. Stat. Dan Terapannya (Bimaster), 01(1), 15–22. https://jurnal.untan.ac.id/index.php/jbmstr/article/view/604/623
Anton, S., Kusumastuti, D. I., & Kunci, K. (2024). Evaluasi Kinerja Pembangunan Ruang Praktik Siswa Menggunakan Kurva-S dan. 10(2), 146–159.
Brianorman, Y. (2019). JEPIN (Jurnal Edukasi dan Penelitian Informatika) Sistem Informasi Monitoring dan Evaluasi dengan Menggunakan Kurva S sebagai Indikator Realisasi dan Kemajuan Pekerjaan. Sistem Informasi Monitoring Dan Evaluasi Dengan Menggunakan Kurva S Sebagai Indikator Realisasi Dan Kemajuan Pekerjaan, 5(3), 344–351.
Hardianta, C., & Effendy, M. (2021). Penjadwalan Proyek Dengan Kurva S Berbasis Tenaga Kerja Pada Proyek Pembangunan Perumahan. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 1(2), 565–572. https://doi.org/10.22219/skpsppi.v2i1.4434
Husen, A. (2011). lr. Abrar Husen, MT. Manajemen Proyek: Perencanaan, Penjadwalan, & Pengendalian Proyek, 2(1), 1–143.
Imron, Jefri, R. R., Teknik, F., & Indonesia, S. (2025). Analisis Desain dan Keandalan Bejana Bertekanan pada Industri Energi Pendekatan Numerik dan Eksperimental. Jurnal Ekselenta-Jurnal Ilmiah Fakultas Teknik, 1(2), 1–10.
Konior, J., & Szóstak, M. (2020). The S-curve as a tool for planning and controlling of construction process-case study. Applied Sciences (Switzerland), 10(6). https://doi.org/10.3390/app10062071
Miftah Fauza, N. kartika. (2020). Metode Earned Value Pada Proyek Pembangunan Trotoar Kegiatan umum proyek dapat diartikan sebagai kegiatan sementara yang berlangsung dengan jangka wakt terbatas dan dikelola satu atau lebih organisasi agar proyek . Hal ini agar dapat mendeteksi sedini mau. Jurnal Ilmiah SANTIKA, 10(1), 37–48.
Munasir, U. F., & Renaningsih, R. (2023). Manajemen Waktu pada Struktur Bawah Proyek Pembangunan Rumah Sakit Kasih Ibu Surakarta. Prosiding Seminar Nasional …. https://proceedings.ums.ac.id/index.php/sipil/article/view/2783%0Ahttps://proceedings.ums.ac.id/index.php/sipil/article/download/2783/2746
Rahmat. (2024a). Rancang bangun mesin stirling tipe gamma menggunakan metode vdi 2221. Ekselenta, Jurnal, 1(1), 1–9.
Rahmat. (2025). Evaluasi Keterlambatan Jadwal Pelaksanaan Proyek Konstruksi Pengadaan Pedestal Crane PT. XYZ. Ekselenta, Jurnal, 1(2), 6–13. https://doi.org/DOI: 10.13140/RG.2.2.16009.15202
Rahmat, & Isdaryanto Iskandar. (2023). Analisa keretakan material mounting boom hydrolic axcavator merk hitachi ZX-470 LC-3f di PT. Darma Henwa Tbk tambang Asam-asam Kalimantan Selatan. Jurnal TESLINK : Teknik Sipil Dan Lingkungan, 4(2), 124–136. https://doi.org/10.52005/teslink.v4i2.129
Rahmat, R. (2019). Pengembangan Mesin Stirling Tipe Gamma Sebagai Tenaga Penggerak Kipas Angin. Teknobiz : Jurnal Ilmiah Program Studi Magister Teknik Mesin, 9(1), 28–36. https://doi.org/10.35814/teknobiz.v9i1.887
Rahmat, R. (2024b). Analisa Kinerja Mesin T-101 Dan TM-660 Pada Proses Mock Up Hot Tapping Pipa LNG. Ekselenta, Jurnal, 1(1), 57–63. https://doi.org/DOI: 10.13140/RG.2.2.19364.59522
Sabariah, I., Syaiful, S., & Ida Hayati, N. (2020). Analisis Metode Network Planning Dan S-Curve Proyek Konstruksi Di Bogor. Astonjadro, 1(1), 28. https://doi.org/10.32832/astonjadro.v1i1.782
Soplanit Nony, Maelissa Nelda, & Henriette D. Titaley. (2021). Analisis Penerapan Metode Line of Balance Pada Pembangunan Rumah Susun Pemkab Kepulauan Tanimbar. Jurnal Simetrik, 11(2), 474–479.
Sugiyarto, Putra, D. D. A., & Purwanto, E. (2016). Penjadwalan Waktu Dan Sumber Daya Manusia Proyek Showroom Dan Bengkel Nissan Magelang. Matriks Teknik Sipil, 366–373.
Sukindrawati, B., Kartika, W., & Sarju, S. (2023). Evaluasi Kinerja Waktu Dengan Metode Konsep Nilai Hasil. Menara: Jurnal Teknik Sipil, 18(2), 110–114. https://doi.org/10.21009/jmenara.v18i2.36648
Sutopo, G. I., & Hendarti, L. (2022). Analisis Kurva S untuk Monitoring Pelaksanaan Proyek (Studi Kasus Proyek Rumah Tinggal di Jalan Cocak II nomer 3, Surakarta). Jurnal Scer, 32–48. https://ejurnal.unsa.ac.id/index.php/scer/article/view/11
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Rahmat Rahmat, Dean Anggara Putra, Rifo Nurlaksana Restu, Jefri Imron, Marhaendra Natawibawa, Hery Sumardiyanto, Khairil Munawar, Thomas Junaedi

This work is licensed under a Creative Commons Attribution 4.0 International License.