Analysis of labor productivity in the installation of walls with lightweight bricks in the construction project of Sudamala Resort Ubud

Authors

  • Pande Made Agus Krisnantara Universitas Pendidikan Nasional
  • Decky Cipta Indrashwara Universitas Pendidikan Nasional https://orcid.org/0000-0002-5656-4011
  • I Komang Agus Ariana Universitas Pendidikan Nasional
  • I Ketut Nuraga Universitas Pendidikan Nasional

DOI:

https://doi.org/10.55942/pssj.v6i2.1372

Keywords:

Labor Productivity, Lightweight Bricks, Work Sampling, Construction Projects, PUPR Regulation No. 01 Of 2022

Abstract

Labor productivity is an important indicator for controlling time, cost, and quality in construction projects. The installation of lightweight brick walls requires a high level of efficiency; however, in practice, there is often a discrepancy between the actual productivity in the field and applicable standards. This study aims to analyze labor productivity in lightweight brick wall installation work and compare it with the standards set out in Regulation of the Minister of Public Works and Public Housing (Permen PUPR) Number 01 of 2022. The study was conducted on the Sudamala Resort Ubud construction project using direct observation and a work sampling approach. Observations were made for 14 working days during normal working hours to obtain data on the number of workers, effective working time, and volume of work produced. The data were analyzed to determine the productivity value and coefficient of workers, which consisted of foremen, master craftsmen, craftsmen, and laborers. The results of the study show that the average productivity of workers in the field is 18.175 m²/day for foremen, 19.123 m²/day for master craftsmen, and 18.546 m²/day for craftsmen and workers, with productivity coefficients of 0.055, 0.041, and 0.239, respectively. Compared to the standard of Permen PUPR 01 of 2022, there are differences in productivity values and coefficients in each labor category. These differences are influenced by the field conditions, workforce composition, and work implementation methods. 

Author Biographies

Pande Made Agus Krisnantara, Universitas Pendidikan Nasional

Pande Made Agus Krisnantara is a student in the Civil Engineering Study Program at Universitas Pendidikan Nasional who is interested in construction management, particularly the analysis of labor productivity in construction projects. He actively develops his understanding of methods for measuring productivity, work efficiency, and the application of technical standards in building projects.

Decky Cipta Indrashwara, Universitas Pendidikan Nasional

Decky Cipta Indrashwara is a lecturer at Universitas Pendidikan Nasional (Undiknas), Denpasar, Indonesia, specialising in transport infrastructure and traffic engineering. His research interests include parking demand modelling, smart mobility in urban settings, and digitalisation of construction management.

I Komang Agus Ariana, Universitas Pendidikan Nasional

I Komang Agus Ariana is a lecturer in the Civil Engineering Study Program, Faculty of Engineering and Informatics, Universitas Pendidikan Nasional. His areas of expertise include civil engineering and construction management, and he is active in education, research, and community service activities.

I Ketut Nuraga, Universitas Pendidikan Nasional

I Ketut Nuraga is a lecturer in the Civil Engineering Study Program, Faculty of Engineering and Informatics, Universitas Pendidikan Nasional. He has expertise in civil engineering and water resources, and is active in education, research, and community service activities.

References

Cahyadi, H., Purnamasari, E., & Nordiansyah, M. (2021). Perhitungan Produktivitas Pekerjaan Pemasangan Dinding Bata Ringan dengan Metode Time Study pada Proyek Pembangunan Ruang Kantor Sekolah Menengah Atas Negeri 5 Banjarmasin. Seminar Nasional Inovasi Teknologi Terapan (SNITT) 2021, 37–43. https://jurnal.poltekba.ac.id/index.php/prosiding/article/view/1342%0Ahttps://jurnal.poltekba.a c.id/index.php/prosiding/article/download/1342/768

Maulana, R., & Saleh, R. (2024). Perbandingan Biaya Pekerjaan Dinding antara Bata Ringan dengan Sistem Pracetak pada Bangunan Rumah. Journal of Engineering Education and Pedagogy, 2(1), 8–15. https://doi.org/10.56855/jeep.v2i1.700

Muntaha, P. A., Herwanto, D., Asyidikiah, M. R., & Karawang, S. (2022). STRING (Satuan Tulisan Riset dan Inovasi Teknologi) ANALISIS PRODUKTIVITAS PEKERJA MENGGUNAKAN METODE WORK SAMPLING DI TOKO XYZ. 6(3), 325–332.

Pratiwi, S. A., & Pudyastuti, P. S. (2023). Pengawasan Dan Pengendalian Mutu Beton Pada Pelaksanaan Pembangunan Bendungan Jlantah. Prosiding Seminar Nasional Teknik Sipil, 50–57.

Putra, I. K. A. A., Pagehgiri, J., & Ariyanta, I. P. G. (2021). Analisis Kinerja Konsultan Pengawas Konstruksi Dalam Pelaksanaan Proyek Gedung Puskesmas di Kabupaten Tabanan. Jurnal Teknik Gradien, 13(1), 48–60. https://doi.org/10.47329/teknikgradien.v13i1.741

Putri, T. A. T. H., Cahyadi, H., & Rachman, T. A. (2023). Analisis Produktivitas Pekerja Dalam Pekerjaan Pemasangan Bata Ringan Pada Proyek Pembangunan Gedung Serbaguna Polres Dan Rehabilitasi Ruang Kapolres Kota Banjarbaru. 1, 47–54.

Saputro, D., & Riyanto, S. (2021). Analisa Manajemen Risiko Pada Pelaksanaan Pembangunan Proyek Konstruksi Khususnya Bangunan Bertingkat Tinggi di Kota Semarang. 16.

Suryadi Putra, T. (2020). Analisis Koefisien Produktivitas Tenaga Kerja Pada Pekejaan Pasangan Dinding dengan Bata Ringan (Comparative Analysis of Labour’S Productivity on Lightweight Brick). 1–63.

Syahputra, M. A. (2023). Rancang Bangun Monitoring Keamanan dan Berat Muatan pada Truk Berbasis IoT.

Downloads

Published

2026-02-27

How to Cite

Krisnantara, P. M. A. ., Indrashwara, D. C. ., Ariana, I. K. A. ., & Nuraga, I. K. . (2026). Analysis of labor productivity in the installation of walls with lightweight bricks in the construction project of Sudamala Resort Ubud . Priviet Social Sciences Journal, 6(2), 627–638. https://doi.org/10.55942/pssj.v6i2.1372
Abstract Views: 0 | File Views: 0